Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 7 results ...

Abrishami, S, Goulding, J, Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(01), 24-41.

Bonev, M, Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(01), 84-106.

Duren, J V, Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(01), 107-28.

  • Type: Journal Article
  • Keywords: performance,perception,procurement,opportunistic behaviour,safeguards,transaction
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-04-2014-0022
  • Abstract:
    Purpose - The purpose of this study is to analyse, from the perspective of agency theory, differences between client and contractor in their perceptions of changes in uncertainty and in inclination to opportunistic behaviour while using a performance-based procurement procedure. In agency theory, dealing appropriately with the uncertainty and opportunism that results from information asymmetry is an essential precondition for successful procurement. Design/methodology/approach - The procurement procedure analysed is the Performance Information Procurement System (PiPS). PiPS is a performance-based procurement method that uses historic performance information to select the expected best performing contractor. In a theoretical model, a PiPS is interpreted as a set of contractual and organisational safeguards. Through a survey, based on this model, the perceived effects of the PiPS safeguards for both clients and contractors are investigated. Findings - Both clients and contractors believe that applying PiPS introduces safeguards that reduce transaction uncertainty. The perceived changes in the discouragement to use opportunistic behaviour when using PiPS differ between client and contractor. Clients do not know and contractors are sceptical as to whether applying PiPS discourages opportunistic behaviour. This difference in perceptions can be explained by the often-traditional background of the two parties’ project teams and the existence of information asymmetry. Originality/value - This is one of the first studies to show that changes in the transaction environment in a performance-based procurement process are perceived differently by the client and the contractor. It is necessary to align the roles of both parties to avoid problems related to opportunistic behaviour.

Kähkönen, K and Rannisto, J (2015) Understanding fundamental and practical ingredients of construction project data management. Construction Innovation, 15(01), 7-23.

Moradi, S, Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(01), 66-83.

Poirier, E, Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting sme. Construction Innovation, 15(01), 42-65.

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(01), 6-18.